PROYECTO TILOS Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage - Instituto Tecnológico de

Página creada Fabio Blanco
 
SEGUIR LEYENDO
PROYECTO TILOS Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage - Instituto Tecnológico de
PROYECTO TILOS
     Technology Innovation for the Local Scale,
     Optimum Integration of Battery Energy Storage

Daniel Henríquez
Jefe de Sección
Dpto. Energías Renovables
INSTITUTO TECNOLOGICO DE CANARIAS S.A.
PROYECTO TILOS Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage - Instituto Tecnológico de
Socios   Grant Agreement number: 646529 — Technology Innovation for the Local Scale,
         Optimum Integration of Battery Energy Storage (TILOS)
         LCE-08-2014 Local / small-scale storage
PROYECTO TILOS Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage - Instituto Tecnológico de
Objetivos y paquetes de trabajo
   •   Demostrar la integración óptima de un
       sistema de almacenamiento de energía
       en una microrred inteligente y en un
       sistema conectado.

   •   Desarrollo y operación de un prototipo
       de batería NaNiCl2 que se integre dentro
       de una planta de generación híbrida         *
       (HPS)./Algoritmos de
       pronóstico/Multipack Optimization

   •   Desarrollo de las herramientas de
       gestión para integrar la HPS como
       sistema de generación de una microrred.

   •   Desarrollo de herramientas para analizar
       la replicación de la solución de TILOS en
       otras sistemas insulares

   •   Operación comercial de la planta
PROYECTO TILOS Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage - Instituto Tecnológico de
Estudios previos
   •   Recurso y demanda
   •   Estudios energéticos (diferentes
       escenarios)
   •   Análisis de red (estacionario, dinámico,
       protecciones …)
PROYECTO TILOS Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage - Instituto Tecnológico de
PROYECTO TILOS Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage - Instituto Tecnológico de
Procedimiento de Autorización

                                •   Autorización provisional como
                                    productor para operar en
                                    pruebas (09/2018)
                                •   Verificación de la operación en
                                    pruebas por el operador
                                    (01/2019)
                                •   Aprobación y solicitud de
                                    autorización de producción
                                    (02/2019)
                                •   Permiso de operación
                                    (02/2019)
PROYECTO TILOS Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage - Instituto Tecnológico de
Componentes de la planta de generación híbrida

             ENERCON E-53 800 kW
             Baterías: 2,8 MWh

                                                 PV 160kW
PROYECTO TILOS Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage - Instituto Tecnológico de
Componentes de la planta de generación híbrida: Aerogenerador

                                                     •   Wind turbine type: ENERCON E-53
                                                     •   Nominal capacity: 800kW
                                                     •   Rotor diameter: 52.9m
                                                     •   Hub height: 60m
                                                     •   Tower type: Tubular steel tower
                                                     •   Wind Class acc. IEC 61400-1: S
PROYECTO TILOS Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage - Instituto Tecnológico de
Componentes de la planta de generación híbrida: Planta Fotovoltaica

                                                                      • Potencia Nominal: 160 kW
                                                                        (159,84 kWp)
                                                                      • 8 x FRONIUS SYMO 20.0-3-M
                                                                        (20 kW)
                                                                      • Conectada en MT (20 kV)
PROYECTO TILOS Technology Innovation for the Local Scale, Optimum Integration of Battery Energy Storage - Instituto Tecnológico de
Componentes de la planta de generación híbrida: batería

    2 baterías (2 x 1,4 MWh – C/10)
    Tecnología: Cloruro de Níquel Sodio (NaNiCl2)
    64 x Módulos FZSonick ST523
    Ratio de carga/descarga: C/3 Nominal
    4500 ciclos (80% DOD)
    DoD máxima: 90%
Componentes de la planta de generación híbrida

 •   Temperatura de funcionamiento: 250ºC – 350 ºC
 •   Óptima para aplicaciones de energía (C/3)
 •   Tiempo de calentamiento (20ºC): 12 horas (max 1
     kW/módulo).
 •   Potencia para mantener la temperatura de operación < 120
     W/módulo
 •   No es necesario acondicionamiento ambiental de la sala de
     baterías (-30ºC – 50ºC)
 •   Algoritmo especifico desarrollado en el proyecto para una
     optimización de la gestión de los módulos de batería
Componentes de la planta de generación híbrida: Inversores de batería

                                                           • 2 inversores x 500 kVA (450 kW cos
                                                             phi=1) (INDRIVETEC AG)
                                                           • 2 centros de transformación 630 kVA
                                                             (20 kV)
                                                           • Eficiencia 98.2 %
                                                           • Pueden operar en modo fuente de
                                                             corriente o fuente de tensión
                                                           • Modo control PQ para cumplir con el
                                                             código de red Griego

    • Red débil. Variaciones > 10%.
    • Cumple con servicios complementarios de control de la tensión (Q-U droop control). No
      remunerado.
    • Servicios complementarios control de frecuencia (P-f droop control). No remunerado
Componentes de la planta de generación híbrida: Control y Herramientas de despacho

                                                                                                  Predicción Energética
                                                                                                  Funciones de Gestión de Energía
                                                                                                  Almacenamiento de datos

                                                                                ITC MMP

                                                                                                               Datos meteo

                                                                                                              ENERCON RTU
                                                                                                                    Control

                                                                              HPS SCADA

                                                                                                      PLC
                                                                                                                  Planta
                                                                                                               fotovoltaica
                                                   Supervisión y control
                                                   Funciones de control de potencia
                                                   Almacenamiento de datos                                       Baterías
                                                                                                                 Control

                                                                                   HEDNO                      Powermeters
                                                                              Centro de Control
Operación en Modo de Prueba (1)
Operación en Modo de Prueba (1)
Operación en Modo de Prueba (1)
Operación en Modo de Prueba (2)

Seguimiento de la Demanda
Modo Prueba
Operación en Modo Regulado                        PPA (Eunice-HEDNO)

 • Ofertas para el día siguiente (24 horas) y oferta intradiario para el segundo periodo del día

 • La declaración debe incluir la potencia máxima despachable por cada unidad de producción si bien
   el programa es establecido para el total de la planta híbrida.

 •   Dos modos:

       1)   Garantizado:

                 Programa firme de generación durante al menos 5 horas al día.

                 Potencia entre los 400 – 800 kW.

                 El operador del HPS propone las horas de operación en régimen garantizado.

                 Retribución superior entre un 30% – 40% al régimen estocástico.

                 Penalización por desviaciones

       2)   Estocástico:

                 Operación normal del parque eólico y la planta fotovoltaica (resto de horas del día).

                 Retribución inferior.

                 Él consumo de energía para la carga de baterías (de red) es posible previa
                  autorización del operador del sistema.
Preparado para diferentes modos de operación de la planta: modo regulado/modo I+D

                                                               2 centros de control
                              2 Plataformas de Operación de
                                                               - Operación Sistema Hibrido
                                 Microrredes y HPS del ITC     - Operación Integrada isla (I+D)
Modo operación emergencia
  • Consignas enviadas directamente por el operador

  • Modo aislado: (inicio pruebas martes 29)
     • Sistema Hibrido en paralelo
     • Diésel (Grid forming)
     • Max RES 70%
     • Control Operador (HEDNO)
     • BlackStart (siempre diésel)

Modo operación I+D
 (pruebas Marzo 2019)
      • EMS Estocástico (I+D) modo aislado -> DSM
      • EMS Estocástico (I+D) modo conectado (no diésel) -> DSM
Modo operación normal (conectado/aislado):
Implementado en la plataforma ITC
• Programa 24 horas
• Ajuste cada 2 horas
• Control directo bombas
• Envío señal precio consumidores

Modo black-start
Herramienta de análisis y pronóstico de funcionamiento de la batería (S2PAT)

                                                    •   Diagnóstico: Permite identificar
                                                        componentes defectuosos y la naturaleza
                                                        de los problemas. Los indicadores de
                                                        diagnóstico se calculan con datos de
                                                        operación reales y permiten saber si cada
                                                        módulo de batería opera de forma normal,
                                                        está degradada o está empezando su
                                                        degradación

                                                    •   Predicción: a partir de los indicadores de
                                                        Estado de salud de la batería se predice el
                                                        estado fututo del sistema, prediciendo el
                                                        grado de envejecimiento al que está
                                                        sometido el banco de baterías.

                                                    •   Permite aplicar tareas de mantenimiento
                                                        preventivo y modificar el algoritmo de
                                                        despacho del sistema (modelo
                                                        econométrico)
Herramienta Integrada de Predicción y EMS

      • Múltiples interfaces de comunicación
        para comunicación con SCADAS, PLC,
        CT, Analizadores de Potencia,…

      • Almacenamiento eficiente de series
        temporales y matrices de predicción.

      • Gestión de la ejecución de múltiples
        modelos de predicción y estrategias de
        gestión energética para microrredes y
        sistemas híbridos.

      • Resultados deterministas y
        probabilistas (Predicción y EMS)
Herramienta de Simulación Microrred Tilos

 • Desarrollada para analizar la isla
   de Tilos en diferentes modos de
   operación
 • Tiene en cuenta impacto DSM y
   Predicción
 • Objetivos de optimización
   diferentes:
     o Seguridad del suministro
     o Costes del sistema
        (completo)
     o Mercado
 • Acorde a la regulación griega para
   NII
Extended Microgrid Simulator

       •   Librería Matlab Simulink
       •   2 tipos de gestión de energía disponibles
       •   EMS Almacenamiento Hibrido para operar dos sistemas de batería de forma simultanea
       •   EMS para operación con señales de mercado
       •   Gestión de provisión de reserva (Mercado SSCC)
Análisis de integración de sistemas híbridos en otras islas: Córcega, Pellworn, La Graciosa
Diseminación, Master Sistemas Híbridos, Cursos de verano

  Punto de
  Información en
  Tilos
                                Cursos de
                                verano en
                                 sistemas
                           híbridos (Tilos)

  Joint Master Programme
                                                           Numero de Artículos > 90
Después del proyecto ¿qué?

   Operación Comercial central Híbrida
   • Plataforma de Operación (ITC) hasta
     2020 (sala de control HPs)
   • Acuerdo bilateral ITC-EUNICE
   • Ajuste de los modelos de predicción y
     EMS

   Operación ISLA (I+D) HEDNO
   • Plataforma de Operación (ITC) en sala
     de control de isla (HEDNO)
   • Acuerdo entre varios socios (UNIWA-
     HEDNO-EUROSOL-EUNICE-ITC)
   • Estrategias DSM
   • Todos los socios (Acceso a datos)
Muchas Gracias
Componentes de la planta de generación híbrida: batería
Modo Prueba